Project Orca

I have started small scall manufacturing and high value item opportunistic manufacturing.  But nothing really systematic.

Therefore, to get a feel of that this is all about such as setting up supply chains and setting up manufacturing lines, i am going to manufacture an Orca.

It will be done in Kihtaled system.

I will be getting materials either from the system or buying from Jita or Amarr, likely Amarr where i can.

For blueprints I will be using BPCs, not BPOs.

A BPC is a Blueprint Copy that was copied from a Blueprint Original (BPO).  They can only be bought through the Contract Market and generally bought for a very low price - there is often a lot listed of the common items and the main competitive advantage a Seller has is the Material and Time efficiencies each copy has (i.e. how much less material and time their copy requires to make the item).

And i will be keeping this blog updated with my progress.

This is a learning curve for me and so will be quite enjoyable i think.